Free UK calculator

Sand & cement mortar calculator

Pick the ratio and tell it the wall area or the mortar volume you need. It returns 25 kg cement bags and sand in tonnes or bulk bags, with waste. Good for laying, repointing and bedding.

m²
mm

Mortar volume

0.000 m³

Includes 30% for voids and joints

Cement (25kg bags)

0 bags

Sharp sand

0 kg

~1 bulk bag = 800kg

Always mix dry before adding water. Use plasticiser not washing-up liquid. Discard any mix unused after 2 hours.

Pricing the job? Open EstiMate free and these quantities go straight onto the materials list with your prices.

How it works out the quantities

  1. 1Brickwork uses about 0.02–0.03 m³ of mortar per m² of half-brick wall; blockwork about 0.01 m³ per m².
  2. 2The ratio sets the cement share: 1:5 means one part cement to five parts sand by volume. Denser mixes (1:3) are for below DPC, copings and pointing in exposed positions.
  3. 3Cement is converted to 25 kg bags (about 1,400 kg/m³ bulk density) and sand to tonnes (about 1,600 kg/m³).
  4. 4Waste of 10–15% is normal for mortar because of dropped and dried material.

Site tips before you order

  • Use building (soft) sand for laying and pointing; sharp sand for bedding slabs and screed.
  • Add plasticiser rather than extra water to improve workability — it keeps the strength.
  • In cold weather keep sand covered and don't lay below 3 °C and falling.
  • Lime mortars for older properties behave differently; the calculator's bag counts are for cement mortars.

Common questions

What mortar ratio for brickwork?

1:5 or 1:6 cement:sand for general facing brickwork above DPC, 1:4 for blockwork and semi-exposed work, 1:3 below ground and for copings.

How much sand and cement per m² of brickwork?

About 25–30 kg of mortar per m² of half-brick wall — roughly 4–5 kg cement and 22–25 kg sand at 1:5, before waste.

How many bags of cement in a bulk bag of sand?

A bulk bag is roughly 0.5 m³ / 800 kg of sand. At 1:5 that's about 6 bags of cement; at 1:4, 7–8 bags.

Can I use this for repointing?

Yes — enter the mortar volume directly (joint depth × joint width × total joint length) and it gives the bags and sand.

From a quantity to a priced line

The calculator gives you the quantity. In EstiMate that quantity becomes a priced line on the quote, with the working printed underneath so the client can see where the number came from, as on this page from a sample quote.

You choose what the client sees. Show or hide the materials and labour breakdowns, and add your markup so the client sees your selling prices. Your true costs and your margin stay inside the app, for you only.

See the full sample quote →
Page of an EstiMate sample quote listing steel beams, columns and masonry with a picture, description, quantity, unit price and total on each line, and the working shown for the brick quantities
Itemised materials from the sample quote, with the working behind each quantity.

Quantities are half the quote. EstiMate does the other half.

Drop the numbers into a priced, branded quote your client can accept online — free for your first three jobs a month.

Try EstiMate free

No credit card · Free plan always available · Cancel anytime

Rather be shown round first? Book a live demo