A single-skin wall of standard UK bricks in stretcher bond needs 60 bricks per square metre, with 10 mm mortar joints. A one-brick-thick wall needs double that, about 120. Concrete blocks of 440 × 215 mm lay at 10 per square metre. Allow 5% extra on facing bricks and 10% on blocks cut around openings.

Those are the figures EstiMate's free brickwork calculator uses. The rest of this page shows where they come from, so you can check a merchant's quantity or your own take-off.
Where does 60 bricks per square metre come from?
Clay bricks are made to BS EN 771-1, the standard for clay masonry units. A standard UK brick is 215 × 102.5 × 65 mm. Add a 10 mm joint to the length and the height and each brick covers 225 × 75 mm of wall face.
That's 0.016875 m² per brick. One square metre divided by 0.016875 is 59.3, which rounds up to 60. The calculator works it out the same way, and lets you change the brick size if you're matching imperial or metric bricks on an older house.
How many courses is that?
Three courses of brick make 225 mm, the same height as one course of block. So a metre of height is about 13 and a third brick courses. A 2.4 m wall is 32 courses.
How many blocks per square metre?
A 440 × 215 mm block with 10 mm joints covers 450 × 225 mm, which is 0.10125 m². That gives just under 10 blocks per square metre, and 10 is the figure to use.
Blocks are usually the inner leaf of a cavity wall, so on a cavity wall you count the bricks for the outer leaf and the blocks for the inner leaf separately.
How do you work out bricks for a whole wall?
Work in square metres, take out the openings, then add waste.
- Measure the wall length and height in metres and multiply them.
- Take off the area of every door and window.
- Multiply what's left by 60 for a half-brick wall.
- Add your waste allowance and round up to the pack size.
A worked example
A garden-room wall is 5 m long and 2.4 m high, so 12 m². It has one door, 0.9 × 2.1 m, which is 1.89 m². That leaves 10.11 m² of brickwork.
10.11 × 60 is 607 bricks. Add 5% for facings and you need 637. Order in whole packs from one batch, so the colour matches across the wall.
How much waste should you allow?
The calculator's guidance is 5% on facing bricks and 10% on blocks that will be cut around openings. Allow more on walls with lots of cuts, piers or reveals.
Order every facing brick for a job in one go if you can. Bricks from different batches can differ in colour, and a band of a slightly different shade halfway up a wall is hard to put right.
How much sand and cement for the mortar?
Allow around 0.02 to 0.03 m³ of mortar for each square metre of brickwork. As a rough guide, 1,000 bricks take about 0.6 m³ of mortar, which is about a tonne of soft sand and 7 to 8 bags of cement at 1:5.
The mortar calculator converts your volume into bags and tonnes for the mix ratio you choose.
What does the brick count leave out?
The count is bricks only. On the quote, remember the items that go with them:
- lintels over every opening
- wall ties in cavity walls
- cavity closers and insulation
- damp-proof course and weep vents
- scaffold, if the wall goes above working height
Do the figures tell you how thick the wall should be?
No. A calculator gives quantities, not design. For new work in England, Approved Document A is the government's statutory guidance on the structure of buildings, walls included.
For a retaining wall, a tall free-standing wall or anything carrying load, get the specification from an engineer or your building control body before you price it. The single-storey extension worked example shows how brickwork fits into a full job price.
Sources and further reading