When does building work need a party wall notice?
By Dave Groom·AI-assisted·Editorial policy
In England and Wales, notice is needed before work to an existing party wall, building a new wall on or at the boundary, or excavating near a neighbour's foundations. Work to an existing party wall needs at least two months' notice. A new boundary wall or an excavation needs at least one month.

The Party Wall etc. Act 1996 puts the duty on the building owner, meaning your client. But the builder usually spots the need first, and the notice periods shape your start date.
What is a party wall?
GOV.UK says a party wall stands on the land of two or more owners and either forms part of a building or doesn't, such as a garden wall. Wooden fences don't count. A wall on one owner's land that separates buildings used by two or more owners is also a party wall.
Floors and other structures separating buildings or flats with different owners are party structures.
Which work on a party wall needs notice?
The government's explanatory booklet lists the common work covered:
- cutting into a party wall to take the bearing of a beam, for example for a loft conversion
- inserting a damp-proof course
- raising the wall, for example to add a storey
- underpinning the whole thickness of the wall, or extending it down for a basement
- demolishing and rebuilding a defective party wall
- cutting off projections, such as removing a chimney breast
The booklet says you mustn't even cut into your own side of the wall without telling the neighbour.
When does excavation need notice?
Notice is needed if you'll excavate, or excavate for and build foundations, within 3 metres of a neighbour's building or structure and any part of the work goes deeper than their foundations.
It's also needed within 6 metres where the work will cut a line drawn down at 45 degrees from the bottom of the neighbour's foundations. Extension footings near the house next door often fall into one of these.
How much notice has to be given?
- Work to an existing party wall: at least two months before the planned start.
- A new wall at or astride the boundary: at least one month.
- Excavation near a neighbour's building: at least one month.
A notice is valid for a year, so don't serve it too early. The neighbour can agree to an earlier start, but doesn't have to.
What happens after the notice is served?
The neighbour can consent in writing or refuse. For work to an existing party wall or an excavation, if they do nothing for 14 days, a dispute is treated as having arisen.
They can also serve a counter-notice within one month asking for extra work for their benefit. You must respond to that within 14 days.
How is a dispute resolved?
Through a surveyor, either one agreed by both owners or one each. The surveyors draw up an award setting out what work can be done and how. The building owner usually pays the surveyors' fees when the work is only for their benefit.
What if work starts without notice?
The Act has no enforcement procedure of its own, but the booklet says a neighbour can seek a court injunction to stop the work. The building owner is also responsible for putting right damage the works cause, even when their contractor caused it.
How should a builder plan for it?
Raise it at the survey stage and tell the client in writing which notices their job needs. Put the notice period and any award into the programme, and state in the quote that party wall costs sit with the client.
The Act doesn't apply in Scotland or Northern Ireland. Our loft conversion quoting guide covers the other approvals that shape a start date.